Most clients don’t distinguish between draftsmen and proper architects.
Wednesday, 4 April 2018
What is the Architect's Registration Board
P. O. Box 25796,Kampala, Uganda.
Tel: 0414 342 390
Tuesday, 7 November 2017
Stamping a Result of lack of Integrity
‘Quack architects testing their limit here. Let’s take our activism to another level and bombard his number with protest notes and warnings’ – Arch Amunsimire
Doesn’t the Uganda Society of Architects retain the services of a lawyer? We pay quite some annual society fees. We should be able to retain the services of a lawyer. A notice to sue such people would be enough. – Arch Mukisa
Instead of protest notes, it should be a suit that is well publicized. I have always insisted that we are to blame for our plight because the law protects us and we always tend to do less than enough to assert our rights. – Arch Bwambale
I believe ARB/USA have tried to do so (sue). At the last ARB seminar this was mentioned. I don’t remember the exact reasons given for failure to pursue such issues.......but I remember something about a weak law – Arch Bazira
Something to do with the law plus the punishment for non-architects being too small to prevent repeat offences. It has also been reported that getting actual evidence against an architect is quite difficult much as it is a known fact – Arch Kabarungi
It is high time (the) Society started biting members who work against its cause without even waiting for ARB...........We are all to blame for these issues not being dealt with.......the guy should be required to say who stamps for him in writing..... Arch Bwambale.
Some years back (prior to 1996), most architectural work was being done by engineers (especially Structural Engineers) who have an idea about the construction of buildings and architectural draughtsman who are generally schooled about the preparation of drawings or plans. For sometime, the Uganda Society of Architects through their leadership pushed for a law that regulated the practice of architecture and this was eventually passed as the Architect’s Registration Statute (1996). This law provides for the registration of architects and other related matters. I remember vividly, fresh out of the university, how this law was a source of excitement for all
It is obvious the proprietors of M/s Morgan Developments Ltd do not know the provisions of the 1996 law. If they were, they would have known that it is not possible for one to claim to be an Interior Designer, Architect, Property Manager, Building Contractor and Supplier without contravening the second schedule of the law (Code of Professional Ethics). It is also obvious from the posts above, that many of the registered architects are tired and fed up of people who call themselves architects yet they are not and do not have to follow the strict rules under which we practice. We are competing with unregulated people. But why has this practice continued despite having a law in place?
For starters, let us look at the law. Clause 34(1) of the Architects Registration Act (1996) provides that
.... any person who not being a registered architect:-
-
a) falsely pretends to be such, or
-
b) uses the style of title ‘architect or any other name, style, title or description
implying whether in itself or in the circumstances in which it is used that such
a person is registered architect or
-
c) holds himself whether directly or by implication to be a professionally
qualified architect commits an offence and shall be liable on conviction, to a fine not exceeding five hundred thousand shillings or imprisonment not exceeding six months or both (emphasis mine).
Some particular members of our profession who are registered as architects have continued to shamelessly append their signatures, names and stamps to drawings that they have not produced or have not been prepared under their supervision. This list is not long (probably not more 10) and is known by everybody who has ever served on the Architects Registration Board. Many of them practically leave their stamps at the printing houses (especially in Nkrumah Road) and usually charge no more than Ush. 500,000 per plan/project. During my time at the Disciplinary Committee, we attempted to bring a few of these guys to face the committee and answer our questions. All of them as if on cue claimed that these drawings/plans had been
Now that we have nurtured this monster within us, the masqueraders have taken it a notch higher. This inside threat has grown so much that some of these non-architects have now evolved into big companies with a capacity to advertise on TV and other media. M/s Namulondo Investments Ltd unrepentantly and unashamedly advertise on TV that they offer architectural services, which is of course against our code of conduct. I have tried to follow this up and been told that they have employed an architect within their set up. I have asked the Registrar and Board’s lawyer to see if such registered architect is not breaching the law. Another company called Creation Architects has put up a signboard on a site in Ntinda and as an after thought or purposeful confusion included the title of the Architect as ‘ARB No. 085’ at the bottom. I am trying to find out from the Board who No.85 is and why he or she would not want to publish his name. Most architects are always proud of their work and would proudly display their name against any work under their hand. The board will also be interested in the architect’s association with Creation Architects. I am also interested in finding out if any one can register their company or firm with the word ‘Architect’ without any of the directors being an architect. By taunting us with those messages last week, M/s Morgan Developments Limited was daring us to see what we can do.
Rather than external factors, we seem to be faced with internal threats as the biggest danger to our profession. We will have to decisively deal with these people and as the Chair Practice Committee of the Architects’ Registration Board, I am open to ideas. I have been informed that the law as it is now does not adequately protect us from this new monster of ‘firms’ that advertise and contravene all the provisions of the Second Schedule of the Architects’ Registration Act (1996). This statute has to be amended to protect us from this new wave of attack on our profession, which unfortunately is being abetted by some of us. I have looked at laws of other countries and our law will have to be amended to deal with this new threat. I am aware of the fact that amending a law is a long and tedious process, but we have to start.
(3) Subsection (1) does not prevent a body corporate, firm or partnership from carrying on business under a name, style or title containing the word "architect" if- (a) the business of the body corporate, firm or partnership so far as it relates to architecture is under the control and management of a person registered in Part 1 of the Register who does not act at the same time in a similar capacity for any other body corporate, firm or partnership; and (b) in all premises where its business relating to architecture is carried on it is carried on by or under the supervision of a person registered in Part 1 of the Register. (United Kingdom)
(2) An architect or architectural firm registered in any other jurisdiction recognized by the board may offer to prac- tice architecture in this state if:
(a) It is clearly and prominently stated in such an offer that the architect or firm is not registered to practice architec- ture in the state of Washington; and
(b) Prior to practicing architecture or signing a contract to provide architectural services, the architect or firm must be registered to practice architecture in this state. (3) A person who has an accredited architectural degree may use the title "intern architect" when enrolled in a struc- tured intern program recognized by the board and working under the direct supervision of an architect.
(4) The provisions of this section shall not affect the use of the words "architect," "architecture," or "architectural" where a person does not practice or offer to practice architecture. (Washington State, USA).
Friday, 10 March 2017
How relevant is Traditional Education for an Architect?
Friday, 15 April 2016
How much should an Architect charge?
Thursday, 19 March 2015
CONSTRUCTION SITE DISASTERS; FIX THE SYSTEM BEFORE THE PROBLEM
Thursday, 12 March 2009
Who is Responsible for Construction Safety in Uganda
That is not the reason however, why I return to this subject, but the question that has been on the minds of many Ugandans lately. Who is responsible for construction safety? Is it the architect, engineers, contractor, developer or the local authority’s building inspection unit?
Conventionally site safety lies with all people involved in the project. The architect and engineer at design stage to ensure that the works can be executed safely, the developer and contractors who must make certain that the execution methods comply with the safety and health standards in place. However, that is only true in an ideal situation where the sites have an architect and engineer appointed by the developer to handle the development project through its course. In Uganda, most developers want to cut corners and avoid what they call unnecessary cost by appointing architects and engineers for design only, and this is mainly to obtain approval for their planned development from the local authority. After Kampala City Council worked with the associations bringing together these professionals to ensure that all drawings submitted for planning approval are handled by registered architects and engineers, most developers had no alternative but to engage registered engineers and architects. It is a well known fact that before this effort developers avoided registered architects and engineers and that is how we ended up with 5-8 storey buildings in the heart of the city without lifts or ample parking space. That not withstanding, a step in the right direction was made and I am positive that the majority of recent developments in Kampala are designed by registered architects and engineers. Unfortunately, that is where the success story ends. Once these drawings have been approved by KCC, developers are free to do what they want and the first thing they do is to do away with registered architects and engineers for the supervision of construction of these buildings, as a means of cutting costs. The situation is further compounded by the appointment of inexperienced contractors on one hand and the failure by KCC to carry out the stage inspections as stipulated by law on the other. This in effect leads to a more complex situation in which no body is responsible for safety on site.
Traditionally design of a building is the responsibility of the architects and engineers and it’s construction is the responsibility of the contractor supervised by the architects and engineers. Once the design architects and engineers are no longer part of the project as is normally the case in Kampala, responsibility for site safety lies squarely with the contractor. Unfortunately this is not explicitly stated by law and as we have learnt from the investigation reports for some of the accidents, contractors usually on the instructions of developers have routinely abandoned plans and executed works that are different from what was designed. Other project participants who should be culpable would be the developer and/or KCC, but I am aware that there is no law that would make either of them criminally responsible. In fact the Building Rules currently in use under the Public Health Act of 1969 specifically state in rule No. 18 that ‘The approval of any plans of any building or structure shall not in anyway impose or imply acceptance of responsibility on the part of the local authority for the stability of any building or structure’.
In the absence of a law that makes any one responsible for safety on site, it is a far cry to expect the trend of events to change for the better. Most of the reports from these sites indicate that almost all accidents are not the consequence of poor design but rather unsafe site conditions, unsafe actions by operatives and lack of management control. The laws that are required in place now should be mainly to do with management of construction sites and the responsibility of developers and contractors for the safety of the public and operatives. At the moment neither of the laws (Occupation Health and Safety Act of 2006 and Public Health Act of 1964) expressly make any body responsible for health and safety on site.
Thursday, 1 May 2008
Why you need an architect
Unless your companion or relative is an architect, or unless you're a corporate facilities manager, you probably haven't had many occasions to work with one. A few who have not had an opportunity to work with an architect but have an idea who architects are, often confuse them with engineers. To the contrary an architect is not an engineer and neither is the reverse true and unless one has both qualifications, one is not qualified to do the job of the other.
As with engineers, architects are responsible for preparing construction drawings and specifications, and certifying them for code compliance and safety. In most cases, the architect is the lead for a new design and construction project. An architect is an essential element in the construction industry, trained and thus obliged to design safe and usable structures. In the broadest sense an architect is a person who translates the user’s needs into a physical built solution. Therefore, they need to be familiar with all the engineering trades as well as the general construction trades. Architects must understand the various methods available to the builder to achieve the client’s desired results within explicit cost and time boundaries.
You probably have heard that the licensing exam for architecture is considered the most difficult of any of the licensed professions. Architects must frequently make building design and planning decisions that affect the safety and well being of the general public. Who would you blame if a building was inadequately designed, and it failed and injured or killed people? It is the responsibility of an architect to ensure that the built environment is safe and habitable.
In
Throughout the world and for many centuries, the architect was historically known as the master builder. The architect's training and experience in all aspects of the planning, design and the construction process make him or her best suited to lead design and construction efforts. This has been true from the time of the great pyramids to a simple house addition.
In
This has made the understanding of when an architect should be involved more confusing, especially for residential construction. After all, how many of us haven't hammered a nail, selected wall material or roof covering for our house? When it comes to houses, all of us seem to have some experience with the basic layout. But an architect can help you integrate your ideas into creative design solutions, even while utilizing commonly available materials. The use of an architect will save you money and space. Architects are trained to pay attention to the use of space and to the economics of the budget for a particular.
I bring this last point because it is very much the centre of not commissioning an architect – that architects are very expensive. First and foremost architects in
Finding an architect is not that hard. Try the Uganda Society of Architects or the Architects Registration Board who have a list of nearly 200 architects licensed to practice in
Should Ugandan Architects accept Competitive Tendering
Introduction
The construction industry all over the world has been under going a period of introspection. Changes in the production and procurement processes that have been witnessed in other sectors as a result of globalisation and technology advancement have not been adopted by the industry at the same pace and level as others like manufacturing. Production in the industry is still labour intensive and the procurement process continues to be adversarial and conflict ridden due to lack of cooperation (Egan 1998; Smith and Love, 2001). Demands for change and greater efficiency particularly in the
The two-envelope method is one of the methods in which price is considered for consultant selection (competitive fee tendering). The two envelope method which is based on the evaluation of bids for both cost and quality, effectively ended the use of mandatory scale of fees as recommended by the professional bodies of most property and construction professionals. This method of procuring services is the most popular method of allocating work to quantity surveyors in the
“The good old days”
A little history will help us to understand why we are no longer in the ‘good old days’ and how we got here. The architect’s profession just like the engineer’s profession emerged in 19th century as result of an attempt to separate people who designed buildings from the craftsmen who built them legally, functionally and organizationally (Thomsen, 2006). Thomsen further observes that as architects and engineers acquired education and degrees, they sought professional status by lobbying for laws and forming professional bodies like those of lawyers, doctors and accountants. It is through these laws and institutions that the practice of architecture was regulated. Thomsen observes that in the following 100 years, architects became so famous in
“In a free market situation, it is often too tempting for consumers requiring professional services to seek out the cheapest, sidelining the issue of quality of service, in particular when such quality is not immediately or easily discernible. This “shopping around” or "marketing for cheaper fees" will lead to an unhealthy widespread undercutting of professional fees. When fees are uneconomic and do not commensurate with the level of the services that ought to be provided, it is not uncommon for the quality of professional services rendered to be compromised. Hence, scale fees will not only benefit, but will also protect, the consumers; since with scale fees professionals will then have to compete with one another on the quality of professional services, and not on pricing.
(The Malaysian Bar, 20 Jan 2006)
In his presentation to the Uganda Society of Architects, Kamya (2008, pp7) says that ‘the practice of negotiating fees or tendering for jobs on a fee basis undermines the morale of professionals and eventually has a negative impact on the standard of projects conceived’ because he goes on ‘consultants are not motivated to excel due to low financial rewards’.
Despite these arguments, scale of fees as recommended and enforced by many professional member bodies are not short of critics. Most critics argue that professional bodies are acting like potential cartels operating only in the interests of their members. Although the scale of fees worked admirably well, the increasing changes in market driven economies and the continuing scrutiny of the construction industry, made their justification increasingly futile and by the end of the 20th century, they had all but gone from most of the developed economies[2].
Changes in Construction Industry
As earlier stated, there has been a continuous call for change in the construction industry over the last 10-15 years and the procurement process is one of those areas that were identified for change. For instance, part of recommendation No. 13.5 of the Latham report (1994, pp47) was “to choose and then endorse a specific quality and price assessment mechanism for the engagement of professional consultants”. In addition to these recommendations, changes in legislation caused by being part of bigger market unions have made the use of a scale of fees untenable. Smith and Love (2001) observe that procurement processes in the construction industry are changing as a result of the economic, social, financial and political/legislative environments. In a European Commission press release of 2004, the Commission ruled that recommended minimum fees by the Belgian Architects Association were in breach of European Union competition rules. The commission further ruled that like fixed prices, recommended prices reduce competition because they can facilitate price coordination. In the
“I do not believe fee scales served the profession well in the past. Fee scales can only reflect averages for typical projects. The design demands of a project, the procurement routes and the services required by clients are becoming increasingly varied. Therefore the average fee scale for that mythical “typical” job is far less relevant and useful”. Richard Brindley, RIBA Director of Practice, 2007)
Facing reality
Over the past few months there has been a campaign by leading and reputable members of the Uganda Society of Architects to fight against competitive fee tendering especially the two-envelope bidding (Kamya, 2008). While this is expected and not only peculiar to Ugandan architects – a similar war is still being fought in
Way forward
In today’s competitive environment fuelled by globalisation and free trade, it is hard to fathom how the Uganda Society of Architects or the Ugandan construction industry in general will insulate itself from these changes. It can be safely argued that rather than fight against the tide, the society and its membership should come up with ways that make our selves more relevant and secure. In its ruling against the Belgian Architects in 2004, the European Communication added that it ‘encourages the national legislators and professional bodies to revise and amend their restrictive rules and practices to enable the professions to better contribute to growth and economic welfare in the EU’. There is need for the Society to recognise that there is a strong wind of change and the earlier we revise our rules the better for all of us. Due to client pressures there is already a change in the way professional consultancy services are offered in the construction industry. We need to be aware of these changes and be prepared to adapt in this volatile and demanding environment short of which our very own survival is threatened. The rise of project management, the increasing use of design and build and increased use of information technology are big changes that we must be aware of and be prepared to adapt to. In his conclusion, Hoxley (2007) attributes the enhanced efficiency in professional firms to the shift to multi-professional organisations. It is not uncommon these days to see architectural firms working as sub-consultants for engineering firms in a job that would typically be awarded to an architectural firm in the past. We need to re-assert our positions as the leaders of the professional team in-charge of constructing buildings by retraining and refocusing the training of architecture. As we re-orient ourselves, we should also take the government and its departments to task to play the game by the rules. While it is well known that successful 2-envelope bidding depends on adequate specification of the service required, careful pre-selection of tenderers and an open, fair and adequate evaluation process, rarely do we get to know the evaluation criteria before hand. Statements like ‘Technical evaluation will carry 80% and financial evaluation 20%’ should be dismissed with the contempt they deserve. Details of what will be evaluated technically should be availed to all tenderers to dispel rumours of some tenderers having had inside information of what exactly was required. There is no reason why one tenderer should be given more marks for having an architect with a post graduate degree on their team when this was not explicitly stated as a requirement in the first place.
Conclusion
The author is aware that much of the envidence provided in this paper is from Europe and it may as well be that the standard and quality of service offered by professionals in the construction industry in
[1] In the early 1990s, the